last update: december 2025 sources: Comune di Collegno – Collegno rigenera
The actions envisage the recovery of the main building of the former three-phase power substation, subject to cultural heritage protection, with the creation of service sector-commercial/management area, the adjustment of the outer surface public space and their transfer to the municipality, after demolition of the existing secondary buildings.
In the rear area, construction works have commenced for the future Certosa metropolitan station, as part of the extension of Metro Line 1 in Turin. This station will represent an important interchange hub, where a cycle–pedestrian connection with the Collegno railway station is planned.
general information
area name
Stazione Elettrica
address/city
Via Torino, Collegno
ownership
Ferrovie dello Stato S.p.a.
urban planning data
land area
12,997 sqm
existing gross floor area
5,000 sqm
main intended use
Commercial and services
information about the area
state of conservation
Good - average
accessibility/connections
20.2 km from Torino Caselle Airport, 7.9 km from Torino Porta Nuova railway station (station with high-speed trains), 6.7 km from Torino Porta Susa railway station (station with high-speed trains), 2 km from Grugliasco railway station, 1.5 km from Collegno railway station, and 750 m from the "Fermi" Metro stop (on foot).
other
description
The action envisages that a minimum overall surface of 4,000 sq m will have to be dismissed and/or subject to constraints for public use.