The actions envisage the recovery of the main building of the former three-phase power substation with the creation of service sector-commercial/management area, the adjustment of the outer surface public space and their transfer to the municipality, after demolition of the existing secondary buildings, demolition and reconstruction of the residential buildings in Via Torino with the conversion to service sector activities. The main building is subject to cultural constraints. The buildings to be reconstructed in Via Torino will have to keep the current number of floors (2 above ground), without prejudice to the possibility of increasing their surface in line with the overall maximum gross floor area.