The complex consists of a shed with a rectangular layout (m 146.95 x 40.20) and a basement, where a building with 3 floors above the ground level was erected. It currently seems in good conditions, also in terms of maintenance. Some works have been recently carried out to restore the roofing and restructure the toilets on the first floor. In 2001, asbestos was found on some of the existing flooring and part of the pipes inside the hollow spaces.