last update: december 2025 sources: Città di Torino, 2025
The project envisages the construction of a new Ecological Collection Centre for separate waste collection, located in the north-western area of the city. This part of the city is currently underserved by such facilities and, with the aim of counteracting illegal waste dumping, it will be equipped with an infrastructure designed to strengthen separate waste collection systems.
The project is funded by the PNRR – Mission 2, Component 1.
general information
area name
Ecocentro
andress/district/city
Massari Street corner Reycend Street, Circoscrizione 5, Torino
project
Eco-centre for separate waste collection
intervention typology
New construction
value
1.5 million euros
urban planning data
land area
10,000 sqm
information about the area
accessibility/connections
15 km from Turin Airport, 4 km from the northern Turin ring road, 5 km from the A4 motorway, and within 500 metres of Torino Grosseto railway station.